Kerhonkson Wastewater Treatment Facility
Location
Kerhonkson, New York
June 2026
Completion Date
J Squared Construction Corp.
General Contractor (GC)
Town of Wawarsing, Ulster County
Owner
Brinnier and Larios, P.C.
Engineer
300 CY
Size
June 2026
Completion Date
J Squared Construction Corp.
General Contractor (GC)
Town of Wawarsing, Ulster County
Owner
Brinnier and Larios, P.C.
Engineer
300 CY
Size
Project Summary
B&B Concrete was selected to construct the cast-in-place concrete clarifier tank and associated structures supporting a new redundant package activated sludge unit at the Kerhonkson Wastewater Treatment Facility. As a critical component of the municipal wastewater process, the clarifier had to be built as a fully water-retaining structure leak-free performance and dimensional accuracy were non-negotiable.
The work integrated tightly with new mechanical equipment, demanding millimeter-level coordination on embeds, anchor bolts, and tank geometry. B&B placed 300 cubic yards of concrete and installed 40,000 pounds of reinforcing steel over a three-month construction window, coordinating closely with general contractor J Squared Construction Corp. and engineer of record Brinnier and Larios, P.C.