BIM & VDC

Coordinate it before the pour. Build it right the first time.

Virtual Design & Construction (BIM/VDC)

Most concrete subcontractors pour from 2D plans and rely on the field to catch what the drawings missed. We model every job first, coordinating it against every other trade, so the hard problems are solved before a single yard of concrete is placed.

In-house BIM/VDC is still rare among self-perform concrete contractors, and it’s one of the clearest things that sets B&B apart.

  • Fewer field conflicts and rework
  • Fewer RFIs and schedule surprises
  • More accurate, defensible bids
  • Faster, cleaner submittals
  • A verified digital as-built at closeout
See Preconstruction & Engineering Support projects →
Coordinated 3D model of a concrete structure

How a B&B project comes together

Every great concrete project starts long before the first pour. Six steps, from quantity takeoff to digital as-built.

  1. 3D model of a concrete foundation used for quantity takeoff
    Step 01

    Model-based takeoff

    Before a bid goes out, we build a 3D model of the concrete scope: slabs, walls, footings and columns. Quantities come straight from the model, not scaled off a 2D drawing.

    • Precise quantities
    • Reliable bids
    • Fewer scope gaps
  2. Clash detected between a pipe and reinforcing steel
    Step 02

    Clash detection

    Structural, MEP and architectural models are combined into one coordinated model. Every conflict is resolved digitally, before construction begins, not after.

    • Find conflicts early
    • Less rework
    • Fewer RFIs
  3. Reinforcement model of a concrete mat foundation
    Step 03

    Constructability review

    Our VDC team checks every concrete element for access, sequencing, reinforcement and coordination. Issues are solved in the model, where changes are faster and cost far less.

    • Pour sequence
    • Rebar review
    • Embed coordination
  4. Wireframe model of a circular concrete tank
    Step 04

    Automated shop drawings

    Rebar shop drawings, embed layouts and anchor bolt plans are produced directly from the 3D model. What the engineer designed is what gets built.

    • Model driven
    • No translation errors
    • Faster approval
  5. Foreman checking the 3D model on a tablet at the job site
    Step 05

    Model to field

    The model doesn’t stay in the office. Layout points go straight to our foremen, who verify embeds on site using augmented reality on tablets.

    • Model-based layout
    • AR verification
    • Field execution
  6. Model and photo of the finished concrete structure side by side
    Step 06

    Digital as-built

    At closeout you get a record of exactly what was poured: every deviation, field adjustment and coordinate. It protects everyone for the life of the structure.

    • Design model
    • Construction record
    • As-built handover

The B&B way

Coordinate before construction

Review sleeves, embeds, openings, anchors, reinforcing and trade interfaces.

Resolve before the pour

Identify clashes, incorporate approved changes and review constructability with the project team.

One source of truth to the field

Deliver coordinated information to the crews building the work, and provide a verified digital as-built at closeout.

Powered by
  • Autodesk
  • Autodesk Construction Cloud
  • Dynamo
  • Model-based layout
  • LOD 350–500

Have a concrete package coming up?

Send us the plans or bid invitation. We’ll identify the coordination items most likely to affect the concrete scope.