BIM & VDC
Coordinate it before the pour. Build it right the first time.
Virtual Design & Construction (BIM/VDC)
Most concrete subcontractors pour from 2D plans and rely on the field to catch what the drawings missed. We model every job first, coordinating it against every other trade, so the hard problems are solved before a single yard of concrete is placed.
In-house BIM/VDC is still rare among self-perform concrete contractors, and it’s one of the clearest things that sets B&B apart.
- Fewer field conflicts and rework
- Fewer RFIs and schedule surprises
- More accurate, defensible bids
- Faster, cleaner submittals
- A verified digital as-built at closeout

How a B&B project comes together
Every great concrete project starts long before the first pour. Six steps, from quantity takeoff to digital as-built.
Step 01Model-based takeoff
Before a bid goes out, we build a 3D model of the concrete scope: slabs, walls, footings and columns. Quantities come straight from the model, not scaled off a 2D drawing.
- Precise quantities
- Reliable bids
- Fewer scope gaps
Step 02Clash detection
Structural, MEP and architectural models are combined into one coordinated model. Every conflict is resolved digitally, before construction begins, not after.
- Find conflicts early
- Less rework
- Fewer RFIs
Step 03Constructability review
Our VDC team checks every concrete element for access, sequencing, reinforcement and coordination. Issues are solved in the model, where changes are faster and cost far less.
- Pour sequence
- Rebar review
- Embed coordination
Step 04Automated shop drawings
Rebar shop drawings, embed layouts and anchor bolt plans are produced directly from the 3D model. What the engineer designed is what gets built.
- Model driven
- No translation errors
- Faster approval
Step 05Model to field
The model doesn’t stay in the office. Layout points go straight to our foremen, who verify embeds on site using augmented reality on tablets.
- Model-based layout
- AR verification
- Field execution
Step 06Digital as-built
At closeout you get a record of exactly what was poured: every deviation, field adjustment and coordinate. It protects everyone for the life of the structure.
- Design model
- Construction record
- As-built handover
The B&B way
Coordinate before construction
Review sleeves, embeds, openings, anchors, reinforcing and trade interfaces.
Resolve before the pour
Identify clashes, incorporate approved changes and review constructability with the project team.
One source of truth to the field
Deliver coordinated information to the crews building the work, and provide a verified digital as-built at closeout.
- Autodesk
- Autodesk Construction Cloud
- Dynamo
- Model-based layout
- LOD 350–500
Have a concrete package coming up?
Send us the plans or bid invitation. We’ll identify the coordination items most likely to affect the concrete scope.